Nordex-Izmır/Bergama 42.5 Mw wind turbines transportation and installation

Status : Completed Projects

Transportation and installation works of 17 pcs. Nordex N90 wind turbines.The discharging at Aliaga port of 9 vessels was done by suitable cranes and the transport by suitable trailers to site.The installation works was done by Demag CC 2800-1.